{"product_id":"the-voip-lounge-25-foot-flat-black-long-handset-receiver-curly-phone-cord-with-long-lead","title":"The VoIP Lounge 25 Foot Flat Black Long Handset Receiver Curly Phone Cord with Long Lead","description":"Brand: The VoIP Lounge\u003cbr\u003e\u003cbr\u003eThe VoIP Lounge Universal Flat Black 25 Foot Handset Cord with long lead. This is a flat black cord that is 25 feet long when it is fully extended to its maximum length, and is about 42 inches in its coiled, unstretched state. Handset cords are rarely used at their maximum length, and most typically usable anywhere from 35% to 75% of their advertised length, depending on how much you want to stretch them. Once stretched to the maximum length, cords do not retain their original shape or quality, so it's important to choose wisely when buying. The advertised size of the full maximum extended length is a Telecom Industry Standard, and not something that is decided by us, or any other manufacturer or seller. Cords \u0026amp; Lengths: Available lengths for most cords are: 7 feet (11 inches coiled \/ unstretched) 9 feet (15 inches coiled \/ unstretched) 12 feet (22 inches coiled \/ unstretched) 25 feet (42 inches coiled \/ unstretched)\u003cbr\u003e\u003cbr\u003e• 25 Feet fully stretched, 3.5 Feet coiled (See Full Description Below)\u003cbr\u003e• Black Color\u003cbr\u003e• Brand New - Individually Bagged\u003cbr\u003e• Please read the description regarding Telecom Industry Standard Cord Lengths","brand":"The VoIP Lounge","offers":[{"title":"Default Title","offer_id":51872669434138,"sku":"MCAB07FK33KRY","price":21.79,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0965\/6772\/2266\/files\/51F_GKP6jrL.jpg?v=1774599953","url":"https:\/\/craftedyogi.com\/products\/the-voip-lounge-25-foot-flat-black-long-handset-receiver-curly-phone-cord-with-long-lead","provider":"Craftedyogi","version":"1.0","type":"link"}